Construction of Multi-level Bus Terminal at the East Entrance of Beirut Gare Routiere, Port de Beirut
YEAR STARTED 1969 YEAR COMPLETED 1973 CLIENT Conseil Executif des Grands Projets de la ville de Beyrouth CONSULTANTS Gicome
Construction of the Multi Bus Terminal comprising: 450m long & 37 m wide 3 storey building.
Foundations on diaphragm wall (barrettes) excavated and cast under bentonite.
Pre-stressed & precast beams for the roofs, 2 floors used as car parks,
Ground floor used as bus terminal,
Upper deck used as motorway.
2 access bridges of 52m and 50m span with prestressed concrete
*Access roads to all floors & connection to neighboring streets.
Foundations on diaphragm wall (barrettes) excavated and cast under bentonite.
Pre-stressed & precast beams for the roofs, 2 floors used as car parks,
Ground floor used as bus terminal,
Upper deck used as motorway.
2 access bridges of 52m and 50m span with prestressed concrete
*Access roads to all floors & connection to neighboring streets.